Complete replacement of an industrial sectional door in a warehouse on rue Maurice Paillard, Villetaneuse (93): new tracks laid out on the floor, door assembled from stepladders, new door in place.
Shasama Fermetures worked on rue Maurice Paillard, in Villetaneuse, to replace a warehouse’s sectional door completely. The new tracks were laid out on the floor, then the new door was assembled in the opening from stepladders, up to the closed door photographed from the front.
What was carried out on site
- Remove the existing sectional door
- Lay out the new tracks on the floor before fitting
- Assemble the new door in the opening from stepladders
- Bring the new door to the closed position at the end of fitting
Intervention facts
- Location
- Villetaneuse · Villetaneuse (93)
- Closure type
- Industrial sectional door
- Specific intervention
- Complete replacement of an industrial sectional door.
- Client profile
- Warehouse
- What we did
- Complete replacement of an industrial sectional door in a warehouse on rue Maurice Paillard, Villetaneuse (93): new tracks laid out on the floor, door assembled from stepladders, new door in place.
- Project category
- Installation
- Project photos
- 4 photographs
From inspection to return to service
This sequence describes our working method for this type of intervention. Job-specific operations are listed separately when they have been confirmed.
Inspect and diagnose
Review the closure, its sticking points and the site constraints before any action is taken.
Work methodically
Carry out the agreed actions with a protected work area suited to the equipment.
Adjust the components
Check alignment, guides and the settings needed for smooth, regular travel.
Test the closure
Check movement, stops and overall behaviour before returning the access.
The matching service, explained step by step: Industrial sectional door installation
An industrial sectional door broken down on your site? We provide emergency repair of your industrial sectional door.
All our work on this type of closure: Industrial closures
What to monitor afterwards
After installation, the first operating cycles provide useful reference points for alignment and consistency.
- Visually check that the guides stay clear and the curtain lowers without drifting.
- Avoid impacts and deposits at the foot of the closure, especially during the initial handover period.
- Request an inspection if play, rubbing or a change in travel appears.