Removal of the existing door and installation of a new industrial sectional door in a warehouse on quai Jules Guesde, Vitry-sur-Seine (94): panels cut to size on site, fitting from a scissor lift.
Shasama Fermetures worked on quai Jules Guesde, in Vitry-sur-Seine, to replace a warehouse’s sectional door. The existing door was removed, panels were cut to size on site with an angle grinder, then the new door was fitted from a scissor lift and photographed raised, from inside and from outside.
What was carried out on site
- Remove the existing sectional door
- Cut panels to size on site with an angle grinder
- Fit the new door from a scissor lift
- Run the new door up to the open position
Intervention facts
- Location
- Vitry-sur-Seine · Vitry-sur-Seine (94)
- Closure type
- Industrial sectional door
- Specific intervention
- Removal of the existing door and installation of a new industrial sectional door.
- Client profile
- Warehouse
- What we did
- Removal of the existing door and installation of a new industrial sectional door in a warehouse on quai Jules Guesde, Vitry-sur-Seine (94): panels cut to size on site, fitting from a scissor lift.
- Project category
- Installation
- Project photos
- 5 photographs
From inspection to return to service
This sequence describes our working method for this type of intervention. Job-specific operations are listed separately when they have been confirmed.
Inspect and diagnose
Review the closure, its sticking points and the site constraints before any action is taken.
Work methodically
Carry out the agreed actions with a protected work area suited to the equipment.
Adjust the components
Check alignment, guides and the settings needed for smooth, regular travel.
Test the closure
Check movement, stops and overall behaviour before returning the access.
The matching service, explained step by step: Industrial sectional door installation
An industrial sectional door broken down on your site? We provide emergency repair of your industrial sectional door.
All our work on this type of closure: Industrial closures
What to monitor afterwards
After installation, the first operating cycles provide useful reference points for alignment and consistency.
- Visually check that the guides stay clear and the curtain lowers without drifting.
- Avoid impacts and deposits at the foot of the closure, especially during the initial handover period.
- Request an inspection if play, rubbing or a change in travel appears.
Project report
Every stage in pictures
5 captioned on-site photographs